Shell Loads First LNG Vessel at Gate Terminal

Shell loads first LNG vessel, using new LNG fuel infrastructure at Gate terminal. The new LNG fuel infrastructure included the construction of a new berth. This new berth has now started operations. The loading of Shell’s chartered LNG vessel, the Coral Methane happened on September 19th., Shell Loads First LNG Vessel at Gate Terminal,

Powered by WPeMatico

Comments for this post are closed.